11-1142
| 3 | 5 | 1016 James | Action Items | Demolition of back portion and detached metal garage-#1016 James Street- Michael Miller (H11-01-872) - Second reading | Passed | Pass |
Action details
|
Video
|
11-1062
| 3 | 4a | 617 Mickens Lane | Action Items | Addition at rear- #617 Mickens Lane- Michael Skoglund (H11-01-855) | Postponed | Pass |
Action details
|
Video
|
11-1138
| 3 | 4b | 617 Mickens Lane - Demolition | Action Items | Demolition of back shed- #617 Mickens Lane- Michael Skoglund (H11-01-855) - Second reading | Postponed | Pass |
Action details
|
Not available
|
11-1134
| 2 | 3 | 1107 Grinnell | Reports | Two story addition on rear. New hip roof to replace existing gable one and new additions to existing second floor porches- #1107 Grinnell Street- Adele V. Stones (H11-01-445) upon remand by the Special Magistrate | Received and Filed | |
Action details
|
Video
|
11-1143
| 2 | 6 | 2 Scheppens Lane | Action Items | Remove existing second story roof deck, rails and fence and add back gable roof that was previously removed- Code Compliance Case- # 2 Scheppens Lane- William Horn (H11-01-804) | Postponed | Pass |
Action details
|
Video
|
11-1144
| 2 | 7 | 1420 White | Action Items | Remove existing seven front columns and replace - #1420 White Street- Infinity Builders (H11-01-929) - Second Reading | Postponed | Pass |
Action details
|
Video
|
11-1145
| 2 | 8 | 817 Eaton | Action Items | Add third story roof to existing third floor deck, extend floor porch floor over second floor porch and add a small spa-#817 Eaton Street-William Horn (H11-01-936) | Postponed | Pass |
Action details
|
Not available
|
11-1198
| 1 | 9 | 616 Petronia (H11-01-791) | Action Items | Second story addition- #616 Petronia Street- Carlos Rojas (H11-01-791) | Postponed | |
Action details
|
Not available
|
11-1199
| 1 | 10 | 211B Duval (H11-01-950) | Action Items | Remodel two storefronts of existing non contributing building and repaint-#211A- 211B Duval Street- L & M Associates- Donald W. Laukka (H11-01-950) | Postponed | Pass |
Action details
|
Video
|
11-1200
| 1 | 11 | 111 Whitehead (H11-01-960) | Action Items | Extend parapet wall 20” up- #111 Whitehead Street-One Call Construction (H11-01-960) | Passed | Pass |
Action details
|
Video
|
11-1201
| 1 | 12 | 1030 Fleming (H11-01-980) | Action Items | Revisions to approved plans. Installation of aluminum round top window on side elevation, installation of glass protection and vent for interior fireplace on back elevation-#1030 Fleming Street- Michael B. Ingram (H11-01-980) | Passed | Pass |
Action details
|
Not available
|
11-1202
| 1 | 13 | 813 Galveston (H11-01-989) | Action Items | Installation of aluminum roof over mobile home- #813 Galveston Lane- AMS Inc. (H11-01-989) | Postponed | Pass |
Action details
|
Not available
|
11-1203
| 1 | 14 | 205 Whitehead (H11-01-997) | Action Items | Construction of two interpretative display structures depicting the historic kitchen and slave living quarters that once were part of the Audubon house. Proposed location is in the garden area of the property. The structures will be wood frame, unpainted and for exhibit only- #205 Whitehead Street- Richard J. Heisenbottle (H11-01-997) | Denied | Pass |
Action details
|
Video
|
11-1204
| 1 | | Revisions - Solar Collector’s Guidelines | Reports | Revisions to solar collector’s guidelines | Received and Filed | |
Action details
|
Video
|
11-1205
| 1 | | Demolition by neglect ordinances | Reports | Demolition by neglect ordinances in other jurisdictions- staff research | Received and Filed | |
Action details
|
Video
|