Min 13-508
| 1 | 1 | March 26, 2013 Minutes
March 26, 2013 Minutes
March 26, 2013 Minutes | Minutes | March 26, 2013 Minutes | Approved | Pass |
Action details
|
Not available
|
Min 13-509
| 1 | 2 | March 28, 2013- Joint Signage Workshop Minutes | Minutes | March 28, 2013- Joint Signage Workshop Minutes | Postponed | Pass |
Action details
|
Not available
|
13-4158
| 1 | 3 | HARC Applications Monthly Report | Discussion Items | HARC Applications Monthly Report | Received and Filed | |
Action details
|
Not available
|
13-4159
| 1 | 4 | 1012 Southard Street | Action Items | Restore original roof slope to rear of historic front structure by removing shed slope. Add two small dormers on front for aesthetics. Remove rear shed roof addition and replace with gable roof as of historic front structure. Replace center connecting flat roof with cross gable roof to eliminate low ceiling. Maintain existing footprint of structures- #1012 Southard Street- Deborah J. and William V. Romano (H13-01-404) | Postponed | Pass |
Action details
|
Not available
|
13-4160
| 1 | 5 | 1222 Grinnell Street | Action Items | Renovate and repair existing one story building. Remove portion of existing rear addition and construct new two story addition at rear-#1222 Grinnell Street - Perez Engineering and Development Inc. (H13-01-418) | Approved | Pass |
Action details
|
Not available
|
13-4161
| 1 | 6 | Changing HARC Meetings | Discussion Items | Changing HARC meetings from twice a month to once a month- Staff | Received and Filed | |
Action details
|
Video
|
13-4162
| 1 | 7 | Recap of Signage Workshop | Discussion Items | Recap of signage workshop- Staff | Received and Filed | |
Action details
|
Not available
|