Meeting Name: Contractors Examining Board Agenda status: Final
Meeting date/time: 2/1/2023 3:30 PM Minutes status: Final  
Meeting location: City Hall
Published agenda: Agenda Agenda Published minutes: Minutes Minutes  
Meeting video: eComment: Not available  
File #Ver.Agenda #NameTypeTitleActionResultAction DetailsVideo
Min 22-1054 11 MinutesSeptember 7, 2022ApprovedPass Action details Not available
23-3771 12 Action Items(Hearing) Case: #22-01451 Address: 1328 Duncan St. Contractor: Key West Trim Works (Luigi Vaccaro) Code Officer: Leo Slecton Date of Violation(s) 11/01/2022 Case: #21-01451 - Building Ordinance Code Violations: Count 1: Sec. 14-37 - Work performed beyond the scope of the issued permits Address: 1328 Duncan St. On 11/01/2022 while conducting a building inspection with City of Key West Chief Building Official Ramsingh, and Code Compliance Officer Leo Slecton observed and photographed non-permitted, and over the scope work at the subject address. No work was being performed during our inspection however, there were four workers onsite that said they were employed by Key West Trim Works. They indicated that they performed the over scope and non-permitted work to CBO Ramsingh. Owner of record is KWRH LLC 817 Duval St. Key West, Fl. BlD2022-2048. I secured a Stop Work Order to the front entry area and left a copy of Ordinance 102-158. Photos have been placed in File Bound and Body Cam Video has been placed in Evidence. Count 2: Sec. 18.117 Acts declared unApprovedPass Action details Not available
23-3778 13 Action Items(Hearing) Case: #22-01291 Address: 1235 Washington St. Contractor: Divoll Construction, Inc. (Richard Divoll) Code Officer: Sean Davis Date of Violation(s) 09/01/2022 Case: #22-01291 - Building Ordinance Address: 1235 Washington St. Code Violation: Count 1: Sec. 14-37 Work performed beyond the scope of the issued permits On September 1, 2022, during an area canvas City of Key West Code Compliance Officer Navarro and Sean Davis observed and photographed work being done that was over the scope of the permit (BLD2022-2338) that was posted at the subject property. The contractor (Divoll Construction Inc. -Richard Divoll) allowed us into the house and admitted that the entirety of the work (demoed the entire inside). The Chief Building Official confirmed that the work for the building permit (BLD2022-2338) and job value ($2,000) was exceeded. A Stop Work Order was posted, and the contractor was advised to obtain the proper permits. Sponsor: Mr. Ramsingh Attachments:ApprovedPass Action details Not available
23-3781 14 Action Items(Hearing) Case: #22-01303 Address: 2302 N Roosevelt Blvd. Contractor: Endless Land Management, Corp. (Oscar Garcia) Code Officer: Roman Stenko Date of Violation(s) 9/03/2022 Case: #22-01303 Address: 2302 N Roosevelt Blvd. Code Violations: Count 1: Sec. 14-37 -Building without a permit During an area canvas on Sunday September 4, 2022, City of Key West Code Compliance Officer Roman Stenko, observed and photographed workers applying coating on the asphalt without the benefit of a permit. Upon further investigation he found that the workers were working on behalf of (American Pavement Corp.) The American Pavement Corp. working under the (Endless Land Management Corp) by owner (Rodriguez, Yunior) statement. A Stop Work Order was posted and the workers advised to cease all further work until obtaining the proper permits. Count 2: Sec. 18.117 Acts declared unlawful. It shall be unlawful for any contractor, as defined in section 18-116, operating anywhere within the city, licensed individually or as a firm contractor, or any officers, directors or qualified representatives of aApprovedPass Action details Not available
23-3783 15 Action Items(Hearing) Case: #22-01545 Address: 2908 Harris Ave. Contractor: Fl Keys Contracting LLC (Anthony N Galvan) Code Officer: Paul Navarro Date of Violation(s) 11/23/2022 Case: #22-01545 Address: 2908 Harris Ave. Coded Violation: Count 1: Sec. 14-37 - Work performed beyond the scope of the issued permit. On November 23, During an area canvas on City of Key West Code Compliance Officer Sean Davis and Paul Navarro observed decking materials on front of the subject property. After being let into the property by the property owner we observed and photographed workers of Fl Keys Construction LLC removing and installing new deck boards and wrapping the foundation with tape as well as an outdoor shower being dismantled. The building Dept. records did not show any permits since 2016. A Stop Work Order was posted and we advised the qualifier (Anthony Galvan) of Fl. Keys Contracting LLC and property owners to apply for all after the fact permits. Sponsor: Mr. Ramsingh Attachments:ApprovedPass Action details Not available
23-3785 16 Action Items(Hearing) Case: #22-01373 Address: 1518 Laird St. Contractor: JC Electric of the Florida Keys (Juan Carlos Morales) Code Officer: Paul Navarro Date of Violation(s) 10/06/2022 Case: #22-01545 - Building Ordinance Address: 1518 Laird St. Code Violations: Count 1: Sec. 14-37 - Building without a permit. On October 6, 2022, City of Key West Code Compliance Officer Paul Navarro was informed by the Code Director (Jim Young) that he was notified that Key West Electric Inc. which is own by Jorge A Sanchez was hired and completed a project at 1518 laird St. and that they are not licensed. The statement proposal that was executed under State License #ER 13013719 that belongs to JC Electric of the Florida Keys Inc (Juan Carlos Morales) was obtained by Code. JC Electric of the Florida Keys applied (BLD2022-2862) for the work at took place at the subject property, no permit issued, or inspections performed as of October 6, 2022. Upon further investigation I found a website and social media for Key West Electric Inc. advertising electrical work within Key West. It should be noted that heApprovedPass Action details Not available
23-3787 17 Action Items(Hearing) Case: #22-01598 Address: 628 Grinnell St. Contractor: Project MGMT & Const Development LLC (Ireneusz Stanislaw Pluscinski) Code Officer: Sean Davis Date of Violation(s) 12/08/2022 Case: #22-01598 - Building Ordinance Address: 628 Grinnell St, Code Violation: Count 1: Sec. 14-37 - Work performed beyond the scop of the issued permits. On 12/08/2022 During an area canvas, City of Key West Compliance Officer Paul Navarro and Sean Davis observed and photographed not-permitted work being done at 628 Grinnell Street. The individuals conducting the work are employees of Project MGMT & Const Development LLC. The above contactor does have a permit for exterior renovations (siding patch repair (10 boards) and painting BLD2022-3441) however upon investigation it was determined the work being done was over the scope and required additional permits. Three rain gutters were removed with new ones ready for installation, as well as a concrete beam removed from the foundation of the house that will require replacement. They spoke to the owner's wife and informed her of the violationApprovedPass Action details Not available
23-3788 18 Action Items(Hearing) Case: #22-01434 Address: 740 Windsor Lane Contractor: Keys Top Construction Inc. (Michael Hurd) Code Officer: Roman Stenko Date of Violation(s) 10/26/2022 Case: #22-01434 - Building Ordinance Address: 740 Windsor Lane Code Violation: Count 1: Sec. 14-37 - Work performed beyond the scope of the issued permits. On 10/26/2022 City of Key West Compliance Officer Roman Stenko opened Code Case #CC2022-01434. During inspection on the morning of 10/24/2022, Building Inspector Tarin Wright observed work being performed over the scope of permit (BLD2022-2045) at 740 Windsor Lane by Keys Top Construction. He spoke to the contractor on-site who was not aware of the additional work being performed (Exterior Hardie Board and interior plumbing?HVAC). He stated he would submit the scope of work revisions to the building Dept. that day (10/24/2022). A Stop Work Order was posted on site until permit revision was approved. Sponsor: Mr. Ramsingh Attachments:ApprovedPass Action details Not available